Wednesday, November 2, 2011

Construction Progress at Buckeye Park and Ride

Howard Blomker with Hunter Contracting drove me in his truck full of contractor things *one of those doors that felt like trying to shut a bank vault* all over Town of Buckeye Park and Ride construction site last week.  This project is the idea and inspiration from the good people of the Town of Buckeye.  The open house is already on the calendar and by the looks of things this place will be ready to pick up bus riders soon.


Howard dropped me off here so he could answer the millions of questions that the many crews on site had waiting for him.  I watched this concrete mix truck mix and dump concrete to make the street that future busses will drive over soon.  Jon McMahon with Overton Builders took over as tour guide at this point. 
The security building is the built structure on the site so far. 

The security building is on the right hand side partially covered by the bus in the forground. The metal roof pitch is cranked much higher than the sketch.  It will be easier to locate from Jackrabbit Road.  Yes, that is all there was out here before this Park and Ride, just busy rabbits fighting with quail over seeds.  

Jon was showing off the hardware for the turn buckle at the metal roof cables.  Mega watt cool.


I know I showed this already but didn't you want to see them smoothing out the concrete?  This was happening so fast!


Security building.  Nobody wanted to be in the picture.


These columns will support a future shade canopy for your parked car.  Well even in the shade those crayons will melt pretty good.